Transshipment process now also possible with barge transfer up to 72 hours
The transshipment process may only be processed if a transfer between terminals is taken out within a certain period of time. This period of time is 72 hours in case of a barge transfer, otherwise unchanged 24 hours.
A barge transfer is only possible, if the means of transport at the Gate-Out and Gate-In is specified with 11 (e.g. inland vessel, barge).
Gate-Out and Gate-In will be evaluated to determine the transfer duration.