ZAPP Circular 49
Content: Introduction of the re-export control system (WKS); Additional interface changes for "self-declaration"
ZAPP Circular 48
Content: Introduction of the re-export control system (WKS); Interface changes for WKS; Scope of ZAPP/EMP changes for WKS; New validations for theā¦
ZAPP Circular 47
Content: ZAPP switched from AES 2.4 to AES 3.0, When LRN is known, ZAPP declarations need to refer to the LRN
ZAPP Circular 46
Content: New date for the ZAPP changeover from AES 2.4 to AES 3.0; Transmission of one-stage AES procedures with LRN; HDS/GM01 transaction transmittedā¦
ZAPP Circular 44
Content: 1. Date of the changeover from AES 2.4 to AES 3.0; 2. Testing of the new message formats
ZAPP Circular 43
Content: 1. Port Order with LRN; 2. Status with LRN; 3. Timeline for the changeover from ZAPP to AES 3.0
ZAPP Circular 42
Content: 1. Update of the dates for the changeover to AES 3.0; 2. Update of the dates concerning the test and introduction of LRN